Hybrid roll on/roll off ferry

Hybrid roll on/roll off ferry

The most advanced hybrid engine European push-pull roll on/roll off ferry. Although the scheduled operating date is 2023- this may be slightly delayed. The proposed ferry will be the largest vessel ever to sail between Dover and Calais (230 meters), with a commitment to reducing carbon emissions by up to 40% and possessing the technological capability to absorb future engineering technologies, operating on a zero emission basis. The contract was announced in early 2020 to be signed with ABB and will be built at the Guangzhou Shipyard in China.